Hi all,
I'm in the planning stages of publishing 1.11.x as 1.12.0.
Are there any glaring concerns or remaining issues that people want to try and solve before we publish a "stable" version.
1.12 planning
Moderator: Moderators
1.12 planning
https://lantisproject.com/downloads/gargoylebuilds for the latest releases
Please be respectful when posting. I do this in my free time on a volunteer basis.
Please be respectful when posting. I do this in my free time on a volunteer basis.
Re: 1.12 planning
Is the issue with sysupgrade not properly signalling completion of the flash process to the web UI specific to the ipq806x architecture (which I know won't be formally supported in 1.12) or more general?
Re: 1.12 planning
More general.
I've redesigned the way it works in 1.13 which will be safer and will automatically reload after upgrade.
But it is based on guesswork because it's no longer possible for the system to signal to us what is happening.
https://github.com/ericpaulbishop/gargo ... 11269947c8
This is all now available in the main Gargoyle repo so it is easier to build.
I've redesigned the way it works in 1.13 which will be safer and will automatically reload after upgrade.
But it is based on guesswork because it's no longer possible for the system to signal to us what is happening.
https://github.com/ericpaulbishop/gargo ... 11269947c8
This is all now available in the main Gargoyle repo so it is easier to build.
https://lantisproject.com/downloads/gargoylebuilds for the latest releases
Please be respectful when posting. I do this in my free time on a volunteer basis.
Please be respectful when posting. I do this in my free time on a volunteer basis.